Quotations are hereby invited for the following: Major service and 36-month statutory inspection of Boiler 2 (John Thompson coal-fired steam boiler) as well as ancillary equipment neglected in the boiler house: Specifications: • Strip the boiler as required for external and internal inspection, • Chemical clean of water side (acid wash), • HP cleaning of tubes, as required, • Sand blasting of tubes & shell, as required, • Service/repair of stoker mat and stoker drive, • Service of all valves, including test certificates for safety valves, • Calibration of pressure gauges, • Refurbishment of gauge glass assembly, cocks, and Mabrey level controls, • Refurbish the FD fan, and ID fan (replace all belts and bearings), • Replacement of guillotine door, and cables, • Replace ignition arch, side seals, etc, • Rebuild the ash wall, • Refurbish 2 x Grundfos feed pumps, • Clean out the electrical panel, • Prepare the boiler for 3-year statutory inspection, • Provide a certified AIA inspection authority to conduct a complete statutory inspection, including pressure test in accordance with the PER 36-month inspection requirements, • Reassemble the boiler, including all new gaskets, lagging and stainless-steel cladding, and refractory brickwork, • Re-commission the boiler and test all safety functions, • Provide a hardcopy inspection book including all test certificates, service records, and certificate of continuance, • Compressor hire must be provided by the contractor, as there is no compressed air supply available in the boiler house, • Any scaffold hire, scaffold erection & inspection must be provided by the contractor, • Replace grit collector, • Replace ash trolley for grit collector, • Replace impellor on ID fan, • Install a Shut of valve on main steam line to factory, • Replace condensate line and replace condensate pumps, from EA to hot well, • Install meter at discharge on hot well, • Overhaul suit blower for boiler no 1 & 2, • Provide project plan and time frame. A standard Safety File must be submitted in hardcopy prior to any work commencing on site. (Offerte №102531312it)

Registrati

Condividi:
Nazione: South Africa
Linguaggio: EN
Numero: 102531312
Data pubblicazione: 09-04-2024
Fonte:

Description

Tutte le informazioni sull'appalto sono chiuse.
Per ulteriori lavori con il sito, leggi le informazioni di seguito.

Chi siamo

Motore di ricerca leader per gare e acquisti in Russia e nel mondo

  • Il più grande database di appalti e fonti di approvvigionamento in Russia e nel mondo
  • Newsletter giornaliera gratuita secondo le tue impostazioni
  • Informazioni sui vincitori delle gare nel formato che ti serve
  • Comoda visualizzazione e caricamento delle informazioni

Scegli noi

Iniziare

Registrazione al sito, dopodiché sono disponibili le seguenti funzionalità del sito:

  • Iscriviti alle mailing list gratuite per le tue frasi chiave
  • Visualizza annunci di gara
  • Esporta informazioni di riepilogo in formato Excel
  • Visualizza parte delle informazioni sui vincitori, fornitori e clienti delle gare

Registrazione

Per utilizzare tutte le funzioni del sito e visualizzare tutte le informazioni, devi registrare un account commerciale

  • Tariffa selezionata
  • Paga per l'accesso in uno qualsiasi dei modi possibili

Accesso completo
Соёлын төвд Лед дэлгэц худалдан авах Fonte: Төрийн худалдан авах ажиллагааны цахим систем

SUPPLY OF SECURITY SYSTEM ELECTRONICS TECHNICIANS FOR INDUSTRIAL SECURITY & SAFETY DIRECTORATE Fonte: Tender Board - Kingdom of Bahrain

Design and Build of Sensory Room for Hidden Disabilities at Bahrain International Airport Fonte: Tender Board - Kingdom of Bahrain

Re-Advertisement of Contract number B147/2023/24: Quotations are hereby invited for the following: Follow up alien clearing on Municipal Erf 8862 (Behind Water Tower). Specifications: The successful candidate will be responsible for: - Immediate clearing and herbicide application to all stumps of alien invasive plants; - Evidence of dye on all stumps that require herbicide; - Appropriate cutting techniques i.e. stumps should be cut no higher than ankle height; - Neatly stacked branches in horizontal stacks along the contour of the slope not more than 1.5meters high; - Provision of appropriate tools and equipment for team members; - Provision of an appropriate team size i.e. not less than 6 people; - Provision of appropriate PPE; - Ensuring that no fires are made on site, - Total m² = 3 492. Herbicide, dye and crop oil will be provided by the Municipality. The contractor must supply water for drinking and for herbicide. Successful candidate expected to start within 1 week after an order number has been reserved. Work expected to be completed in 15 working days excluding rainy days. Please note this quotation was published late. Fonte: ONLINE TENDERS

Re-Advertisement of Contract Number B148/2023/24: Quotations are hereby invited for the following: Servicing and repair of air-conditioners at the ICT Server Rooms. Specifications: - Servicing of 12 000 Btu Inverter Air-conditioners x 3, two at the ICT main server room, Finance Building and the other one at the Corporate Building. Please note this quotation was published late. Fonte: ONLINE TENDERS

Quotations are hereby invited for the following: Annual Servicing of Firefighting Equipment (Fire Extinguishers & Hose Reels). Specifications: 1 x Fire Extinguishers (Dry Chemical Powder), Size: 1 - 9kg: - Service, - Pressure test, - Refill powder & gas (nitrogen), - Parts (if required), - Replacement of extinguisher if necessary, - Sign posting as required. 1 x Fire Extinguisher(Carbon dioxide) CO², Size: 2kg & 5kg: - Service, - Pressure test, - Refill, - Parts (if required), - Replacement of extinguisher if necessary, - Sign posting as required. 1 x Fire Extinguishers (Dry Chemical Powder), Size: 50kg: - Service, - Pressure test, - Refill powder & gas (nitrogen), - Parts, - Replacement if necessary. 1 x Hose reels: - Signage, - Service, - Testing, - Parts, - Replacement if necessary. The work sites include Knysna, Buffalo Bay, Belvidere, Brenton, Karatara, Rheenendal and Sedgefield. Please note this quotation was published late. Fonte: ONLINE TENDERS