Quotations are hereby invited for the provision of splicing and pulley lagging for Richards Bay on an as and when required basis for a period of sixty (60) months. Task to be performed on splicing: • Cold splicing; • Hot splicing; • Clip splicing; • Roll up of conveyor belt; • Super screws; • Conveyor belt repairs. Task to be performed on pulley lagging: • Pulley lagging using ceramic; • Diamond pulley lagging; • Pulley crowning. Minimum of 3 splicing crews is required each crew to have: • 1 x Supervisor; • 2 x Semi-Skilled Splicers. (Offerte №115657385it)

Registrati

Condividi:
Nazione: South Africa
Linguaggio: EN
Numero: 115657385
Data pubblicazione: 09-12-2024
Fonte:
Scadenza per le domande in : 38 giorni

Description

Tutte le informazioni sull'appalto sono chiuse.
Per ulteriori lavori con il sito, leggi le informazioni di seguito.

Chi siamo

Motore di ricerca leader per gare e acquisti in Russia e nel mondo

  • Il più grande database di appalti e fonti di approvvigionamento in Russia e nel mondo
  • Newsletter giornaliera gratuita secondo le tue impostazioni
  • Informazioni sui vincitori delle gare nel formato che ti serve
  • Comoda visualizzazione e caricamento delle informazioni

Scegli noi

Iniziare

Registrazione al sito, dopodiché sono disponibili le seguenti funzionalità del sito:

  • Iscriviti alle mailing list gratuite per le tue frasi chiave
  • Visualizza annunci di gara
  • Esporta informazioni di riepilogo in formato Excel
  • Visualizza parte delle informazioni sui vincitori, fornitori e clienti delle gare

Registrazione

Per utilizzare tutte le funzioni del sito e visualizzare tutte le informazioni, devi registrare un account commerciale

  • Tariffa selezionata
  • Paga per l'accesso in uno qualsiasi dei modi possibili

Accesso completo
Төрийн албан ёсны бичиг Үндэсний бичиг рүү шилжихтэй холбоотой компанийн төв, нэгжийн байрны хаягийг шинэчлэх Fonte: Төрийн худалдан авах ажиллагааны цахим систем

Номингийн уулзвараас АН4 зам хүртлэх гудамжны тохижилт Fonte: Төрийн худалдан авах ажиллагааны цахим систем

Монгол Улсын тээврийн холболт болон логистикийг сайжруулах төсөл – Багц 3 Fonte: Төрийн худалдан авах ажиллагааны цахим систем

Quotations are hereby invited for the services of dust suppression using water spraying tanker truck at the Maydon Wharf and Agri Terminals on as and when required basis for period of three (3) months. Scope of Work: - Water spraying tanker truck (with sprinkler attachment); - Water tanker truck must have a capacity of 10 000 – 15 000 litres; - Water tanker truck will work for 24 hours in everyday, weekend and public holidays included as and when required by operations; - The service provider will provide a water tanker, a truck with mechanically operated water tanks on back, recommended for dust suppression on the operational area, including the spraying stockpile up to 9 meters high and in between various stockpiles, on walkways and roads within the terminal, to result in dust suppression, encouraging a clean and hygienic atmospheric level. The water tanker must also have an extendable pressure cleaner to assist in clearing mud/dust in weighbridge. Fonte: ONLINE TENDERS

Addendum: Extension of Closing Date and Amendment to Document: Proposals are hereby invited for the design, supply, installation, pre-testing and fault finding of various associated equipment at Quail, Pieters and Pepworth 3kv DC traction substations under the control of depot engineer. Scope: This specification covers the requirements for the design, manufacture and supply of battery charger units used in 3 kV DC traction substations. Fonte: ONLINE TENDERS

Addendum: Extension of Closing Date: Quotations are hereby requested for the appointment of a service provider to conduct a coal market intelligence study for the Port of Richards Bay over a period of six (6) months. Scope of services: The coal market study is intended to gather intelligence on projected short, medium- and long-term market conditions and anticipated shift to direct investment on strategic port infrastructure associated with handling of coal as a commodity. The coal market study is expected to be delivered over 6 months period and will be used as a base to either uncover new markets, drive market expansion, minimise investment risk, gain advantage over competitors or as a tool to expand the port’s market share. Over and the listed benefits, the study will further help the port in achieving the following: • Capital planning and allocation for growth projects; • Alignment of the port investment plan to changing coal market conditions; • Decision making in relation to diversification of commodities by the ports (if needed); and • Optimisation of available assets (i.e. minimising whole-life cycle cost) as well as sustainable infrastructure development. Fonte: ONLINE TENDERS