Lebalelo Water User Association (LWUA) invites prospective applicants to submit pre-qualification documents for the construction of approximately 70 km of 1 200 mm diameter steel pipeline from the Flag Boshielo dam to a terminal reservoir at Pruissen (near Mokopane) and appurtenant works. Along the route, three pump stations will be required: the first at the Flag Boshielo dam, the second in the vicinity of Immerpan (on the farm Malgas), and the third near Pruissen (on the farm Doornfontein). Two balancing dams will have to be constructed, one at the second and one at the third pump station (Malgas and Doornfontein). From Pruisen Terminal Reservoir a 24.5 km gravity steel pipeline of 1 100 mm to 1 400 mm diameter will be constructed to Mokopane and Sekuruwe. (Offerte №78512334it)

Registrati

Condividi:
Nazione: South Africa
Linguaggio: EN
Numero: 78512334
Data pubblicazione: 23-02-2023
Fonte:

Description

Tutte le informazioni sull'appalto sono chiuse.
Per ulteriori lavori con il sito, leggi le informazioni di seguito.

Chi siamo

Motore di ricerca leader per gare e acquisti in Russia e nel mondo

  • Il più grande database di appalti e fonti di approvvigionamento in Russia e nel mondo
  • Newsletter giornaliera gratuita secondo le tue impostazioni
  • Informazioni sui vincitori delle gare nel formato che ti serve
  • Comoda visualizzazione e caricamento delle informazioni

Scegli noi

Iniziare

Registrazione al sito, dopodiché sono disponibili le seguenti funzionalità del sito:

  • Iscriviti alle mailing list gratuite per le tue frasi chiave
  • Visualizza annunci di gara
  • Esporta informazioni di riepilogo in formato Excel
  • Visualizza parte delle informazioni sui vincitori, fornitori e clienti delle gare

Registrazione

Per utilizzare tutte le funzioni del sito e visualizzare tutte le informazioni, devi registrare un account commerciale

  • Tariffa selezionata
  • Paga per l'accesso in uno qualsiasi dei modi possibili

Accesso completo