per soldi: appalti, appalti pubblici 2024. Pagina № 3




Registrati

Condividi:
totale: 2933
11 nov

Numero: 113812803

Nazione: Germany

Fonte: RFQ

05 nov
Tenders are hereby invited for the appointment of a contractor for the design, construction and commissioning of the prayer facilities and staff rest area at King Shaka International Airport. Scope of Work: Works deliverables include but not limited to: New Islamic faith prayer facilities: a. Islamic faith prayer facilities: approximate extent, 100 sqm under roof; b. Multidenominational prayer facilities: approximate extent 75 sqm under roof; c. Male and female sections wash areas; d. Sandals and shoe rack; e. Trolley parking area; f. Bulk HVAC, Fire detection and suppression system; g. Bulk Electrical supply; h. Bulk electronic supply ACSA electronic standards: i. Flight information display feed; ii. Wi-fi network access; i. Male, female and disabled ablutions; j. Exclude all internal furnishing; 2. New multidenominational faith prayer facilities: a. Multidenominational prayer facilities: approximate extent 75 sqm under roof; b. Trolley parking area; c. Bulk HVAC, Fire detection and suppression system; d. Bulk Electrical supply; e. Bulk electronic supply ACSA electronic standards: i. Flight information display feed and monitor; ii. Wi-fi network access; f. Male, female and disabled ablutions; g. Supply all basic furnishings as shall be prescribed; 3. Establish new staff rest area: approximately 200 sqm: a. Bulk HVAC, Fire detection and suppression system; b. Bulk Electrical supply; c. Bulk electronic supply ACSA electronic standards: i. Flight information display feed and monitor; ii. General purpose TV monitor; iii. Wi-fi network access; d. Male, female and disabled ablutions; e. Supply all basic furnishings as shall be prescribed; 4. Design the works and get them approved internally and externally; 5. Services investigations; 6. Cost the works and get the cost approved; 7. Submit safety plan file, comply with required training, obtain works and personnel permits; 8. Establish site camp and procure materials; 9. Submit construction program for approval and the estimated cash flow; 10. Commence construction and maintain program milestones, revised as per the provisions of contract; 11. Close out the works. Contractor shall make themselves familiar and comply with the closure requirements, especially on issuing CAD drawings and Data; 12. Commission and hand over in accordance with ACSA maintenance and engineering’s department. Key personnel required: 1. Mechanical Engineer; 2. Electrical Engineer; 3. Structural Engineer; 4. Civil Engineer; 5. Quantity Surveyor; 6. Construction Manager; 7. Construction Health and Safety Agent. (EN) Aggiungi a preferiti
Scadenza per le domande in : 15 giorni
Cliente: ONLINE TENDERS

Numero: 113475510

Nazione: South Africa

Fonte: ONLINE TENDERS