su porte antincendio: appalti, appalti pubblici 2025. Pagina № 8




Registrati

Condividi:
totale: 577
01 jun

Numero: 105325648

Nazione: Canada

Fonte: RFQ

17 may
NCC1060 Concordia Fire Doors Replacement Scheme (EN) Aggiungi a preferiti
Prezzo del contratto iniziale : 177 403 (EUR)
Importo originario: 156 000 (GBP)

Cliente: Northumberland County Council

Numero: 104595880

Nazione: United Kingdom

Fonte: gov.uk Contracts Finder

16 may
REPAIRS TO FIRE EXIT DOORS TO MAIN BUILDING AT IISER PUNE (EN) Aggiungi a preferiti
Cliente: Central public Procurement portal India

Numero: 104480946

Nazione: India

Fonte: Central public Procurement portal India

15 may

Numero: 104367812

Nazione: South Africa

Fonte: SA-Tenders

10 may

Numero: 104184139

Fonte: RFQ

08 may
Bids are hereby invited for the following: Supply and install new hot water gas geysers and gas cylinders at Uilenkaalsmond Resort. Specifications: 1. The existing walls around the diesel tank to be removed. Two walls to be built: 8m long, 1.8m high, and 230mm wide – situated on the corners in the boiler room. A solid floor raised 5cm to be laid. A non-flammable roof fitted over. The electrical cable on the wall to be moved out the gas cage; 2. 3 x 1m lockable security gates to be installed to protect the gas cylinders; 3. Plumber to provide sufficient cold water to both geysers and isolate hot water pipe to the men’s and ladies’ ablution facilities. Men’s geyser installed in boiler room. Ladies’ geyser in the ladies disabled toilet, in a lockable box; 4. Provide an emergency backup power inverter to power both geysers for at least four hours. Connect power from the inverter to both geysers; 5. Replace block 1 and block 2 boiler room doors with secure louvered aluminum doors; 6. Repair boiler room roof, clean and paint room; 7. Provide 3 x 3 stainless steel manifold, HP auto changeover regulator, two high demand low pressure regulators, 20m pex pipe, valves and connectors as required to connect two geysers; 8. Provide 2 x 28L Class C internal gas water heaters; 9. Provide 6 x 48kg gas cylinders filled with LPG; 10. Have a fire plan drawing prepared for approval by the fire department before commencement of work; 11. Provide fire extinguisher required for gas fires and protective cover; 12. Display all relevant signs as required; 13. Issue a certificate of compliance on completion of work. (EN) Aggiungi a preferiti
Cliente: ONLINE TENDERS

Numero: 104108283

Nazione: South Africa

Fonte: ONLINE TENDERS