per attrezzature antincendio: appalti, appalti pubblici 2024




Registrati

Condividi:
totale: 565
25 nov
Tenders are hereby invited for the maintaining, service, repair, and statutory testing of fire detection system at Duvha Power Station, this includes fire detection system at Duvha Village for a period of five (5) years. Maintenance and Service of Fire Detection System involves the following: • All alarms, faults and conditions displayed on Fire Panels should be investigated, repaired and faults cleared – special care should be taken for the same alarms, faults & conditions not re-appear within 48 hours. • Repair field faults and replace faulty equipment as required, including the Fire Damper equipment like Actuators, IO Modules and 24 Volt Power Supplies to the Fire Dampers. • Repair faulty field wiring and faults that are logged on the Fire Panels, including Fibre Optic cables and Fibre-to-copper convertors and all related equipment. • Installation, Commissioning and testing of all wiring, Field Equipment, Detectors, Fire Dampers and Fire panels when required. • Install / replace Fire Prevention Cushions / Seal bags in cable tunnel cable cavities as required. Inspect all the cable entries and Fire Cushions on yearly basis or as and when required. • Do all other required maintenance on the Fire Detection System as required and notified. • Re-route or move Field Wiring, Equipment and Fire Panels as and when required. • Programming and updating of software versions on Fire Panels for existing and new equipment to be done as and when required. Upgrading or changing Equipment addresses and descriptions on Fire Panels and drawings when required. • Fire Dampers and related Field Equipment and Power Supply Units must be maintained and tested to ensure that they are active and enabled on the Fire Panels. Activation of Fire dampers need to be investigated to distinguish between real or false alarms. Fire Dampers must be opened / closed manually or reset via the Fire Panels on request or as and when required. EMD Air-condition department need to be informed about closed Fire dampers and dampers need to be opened/closed as and when required. • A communication Link must be established and maintained between the Fire Detection System and the air-condition Building Management System (BMS). Care must be taken that any Fire damper activation info must be correctly signalled / communicated to the BMS to ensure that the correct air condition system is switched off or restarted when Fire alarm is cleared and the Fire dampers opened. • Monitor, reset and repair alarms due to the activation of Fire Deluge valves on site. • Testing and installation of pressure switches on the fire protection systems. • Spares and materials will be supplied by Eskom, unless otherwise specified. Contract Controller need to be informed timeously about any spare and material requirements. • Report all true Fire Conditions & Alarms, False Alarms, damaged and disabled Fire Detection Equipment timeously to the Contract Controller. There will never be a situation where the Contract Controller is unaware of certain Fire System Conditions / limitations / damaged equipment or disabled equipment – the Fire Detection Contractor will be held responsible in such instances. • Investigations and Alarm printouts will be made in case of any Fire- or explosion conditions to prove that the Fire Detection System operated correctly or not. Comprehensive reports will be compiled within the shortest possible time frame. The Contractor will provide all possible expertise needed to do these investigations and will assist Eskom with insurance claims that might arise from such an incident. • Provided training to Eskom personnel to operate the Fire Panels and other Fire Detection Equipment when required. • Update drawings and manuals to as-build on site and provide Eskom with latest updated master copy of all programming on Hard copies, CD-ROM and/or USB Flash drive. Two hard copies of all drawings must up be neatly filed and kept on site. Drawings must be updated and kept current at all times. • Passwords to all Fire Panels will be provided to the Contract Controller. • Service Team should be on site from 07H00 to 16H15, 5 day a week. • Servicing Team reports to the Contract Controller, Selobalobane Riba, of Duvha Power Station on arrival and before leaving site. (EN) Aggiungi a preferiti
Scadenza per le domande in : 64 giorni
Cliente: ONLINE TENDERS

Numero: 114731830

Nazione: South Africa

Fonte: ONLINE TENDERS

23 nov
Request for Quotation - Supply and Delivery of IT Equipment for the Danao City Fire Station (UK) Aggiungi a preferiti
Prezzo del contratto iniziale : 1 477 (EUR)
Importo originario: 85 432 (PHP)

Cliente: CITY OF DANAO, CEBU
21 nov
Quotations are hereby invited for the appointment of engineering consulting firm for the renovations of the client"s two student accommodation buildings. Scope of works: Please note: the following are the minimum identified items that will require the service provider’s attention. The scope may vary due to the nature of work. Renovations: • Assess the renovation requirements for both residences, • Determine accurate costs for materials, labour, and services, • Ensure compliance with relevant regulations and standard building codes, • Repair flooring as per findings, • Cover cracks on the walls, • Paint walls as per university standards, • Replace doors and windows as needed, • Repair all damaged areas and ensure compliance with relevant building codes and regulations. Electrical Reticulation Refurbishment: • Refurbish electrical reticulation systems as needed, • Replace missing light fittings and switches, • Inspect electrical wiring and conduits. Plumbing and Drainage Refurbishment: • Install new plumbing and drainage system and ensure compliance with relevant building codes and regulations, • Inspect plumbing and drainage systems. Fire equipment Refurbishment: • Install new firefighting equipment and ensure compliance with relevant building codes and regulations, • Inspect firefighting equipment. Ensure at the end that both buildings are ready for occupation as required by the eThekwini Municipality. (EN) Aggiungi a preferiti
Scadenza per le domande in : 6 giorni
Cliente: ONLINE TENDERS

Numero: 114528770

Nazione: South Africa

Fonte: ONLINE TENDERS

19 nov
Job Required to be carried out for supply and Fixing of Fire Fighting Equipment under GE (West) Lucknow (EN) Aggiungi a preferiti
Scadenza per le domande in : 2 giorni
Cliente: Central public Procurement portal India

Numero: 114341152

Nazione: India

Fonte: Central public Procurement portal India

14 nov
JP/B224-000-MF-MR-8074/015 - CHASSIS MOUNTED FIRE FIGHTING EQUIPMENT AT MUNDRA FOR RAJASTHAN REFINERY PROJECT (RRP) OF HRRL (EN) Aggiungi a preferiti
Scadenza per le domande in : 8 giorni
Cliente: Central public Procurement portal India

Numero: 114073029

Nazione: India

Fonte: Central public Procurement portal India

14 nov

Numero: 114073032

Nazione: India

Fonte: Central public Procurement portal India

12 nov
Office Equipment (Desktop Computer) for the use of Passi City Fire Station/BFP P146,265.00 (UK) Aggiungi a preferiti
Prezzo del contratto iniziale : 2 529 (EUR)
Importo originario: 146 265 (PHP)

Cliente: CITY OF PASSI, ILOILO
10 nov

Numero: 113792910

Nazione: South Africa

Fonte: ONLINE TENDERS

08 nov
Procurement of Office Equipment for Bureau of Fire Protection Burgos, Pangasinan (UK) Aggiungi a preferiti
Prezzo del contratto iniziale : 1 728 (EUR)
Importo originario: 99 900 (PHP)

Cliente: MUNICIPALITY OF BURGOS, PANGASINAN
03 nov
FIRE FIGHTING EQUIPMENT AND PROTECTIVE GEAR OF MACO FS PERSONNEL FOR RESCUE OPERATION. (UK) Aggiungi a preferiti
Prezzo del contratto iniziale : 4 541 (EUR)
Importo originario: 262 600 (PHP)

Cliente: MUNICIPALITY OF MACO, COMPOSTELA VALLEY