per soldi: South Africa appalti, appalti pubblici 2025




Registrati

Condividi:
totale: 170
11 mar
Quotations are hereby invited for the drafting of an independent report of the long-term financial plan for the ten (10) year period up until 30 June 2035. Specifications: 1. The previous 3 year’s historical information (2021/2022; 2022/2023; 2023/2024) (Statement of Financial Performance) to provide for a basis to reflect on the financial performance of the Municipality in the past and to plot future financial trends, 2. The Statement of Financial Position and the Cashflow statement are also required for a 10 year period. Three years MTREF and 7 years forecasting based on assumptions. The budget assumptions must be clearly documented in the report, 3. The latest approved 3 year’s MTREF operating budget (2024/2025, 2025/2026, 2026/2027), to provide for a basis to project the financial performance of the Municipality for the next 3 years. The format must be the same as the historical Income Statement aforementioned, 4. Also include the information of the Mid-Year Adjustment Budget for 2024/2025, 5. Appropriate corresponding summary tables (as prescribed by National Treasury) must be provided for the capital budget per Municipal Standard classification, 6. The LTFP must provide forecasting for the next 7 years, therefore 10 years in total if the MTREF period is added, 7. The following ratios must be provided for (Use the formulas as per Stellenbosch Municipality policies or if not included in the policies the formulas in the MFMA circular 71): 7.1. Current ratio, 7.2. Debtors collection ratio, 7.3. Employee cost ratio, 7.4. Cash generated from operations as % of own Revenue, 7.5. Cost coverage, 7.6. Debt to Revenue, 7.7. Gearing ratio, 7.8. Water distribution losses, 7.9. Electricity distribution losses, 7.10. Outstanding services debtors as % of total annual service revenue, and 7.11. Revenue growth, 7.12. Each input for these ratios must be linked to the model and data set or provide for separate easy input by municipal officials, 7.13. These ratios must be provided for the previous 3 years (historical), the next 3 years (as per latest MTREF), plus 7 years thereafter to complete the 10-year planning period, 8. Detailed explanation for variances on the above specified variances must be provided in the report, 9. In addition to the ratio, a list of financial indicators must be developed and presented in a “dashboard” format. These dashboard items will be provided by the municipality, 10. Sensitivity analysis of external funding calculations to indicate the impact on the financial position and future rates and tariffs of future borrowings within the policy framework of Council must be provided, 11. The municipality will provide the capital projects as encapsulated in the Capital Expenditure Framework, including the prioritization of capital projects for a 10-year planning period. The affordability envelope must be determined for the capital projects based on a funding mix. Assumptions and forecasts must be clearly documented, 12. The municipality has various ring-fenced reserves and provisions. The assessment must provide for the funding envelope of this for a 10-year planning period, 13. Link all information to the workings and assumptions that are being used, 14. The service provider must include the impact of all major current economic influencers such as load shedding, Eskom price increases, looming worldwide recessions, inflation indicators etc within the updating of the LTFP, 15. The report should include appropriate graphs, tables and figures, 16. Provision for a Net Present Value (NPV) calculator. (EN) Aggiungi a preferiti
Scadenza per le domande in : 7 giorni
Cliente: ONLINE TENDERS

Numero: 120276123

Nazione: South Africa

Fonte: ONLINE TENDERS

14 feb

Numero: 118968579

Nazione: South Africa

Fonte: ONLINE TENDERS

30 jan
Quotations are hereby requested for the training of municipal officials on municipal finance management programme. Scope of Work and Parameters: • Service Provider should be accredited with National Treasury and LGSETA to render training services in the Municipal Finance Management Programme competencies NQF level 6, • Should provide evidence on competent facilitators and registered assessors and moderators, • Should conduct skills audit and identity gaps for competency requirements in line with National Treasury and LGSETA, • Should be able to bridge from competency requirements into qualification, • The municipality will provide training venue and refreshments while the accredited provider will facilitate and manage training proceedings of the training for the allocated days, • The program should not exceed 12 months to complete. Course outlines and unit standards: • Introduction or induction, • Interpret South African Legislation and Policy Affecting Municipal Financial Management, • Apply the Intergovernmental Fiscal Act to 2020 Municipal Management, • Conduct stakeholder consultation around municipal finance programme, • Apply the principles of ethics in a municipal 2020 environment, • Contribute to capital planning and financing, • Apply costing principles to municipal operational and service-based costing, • Apply the principles of budgeting within a municipality, • Plan a municipal budgeting and reporting cycle, • Prepare and Analyze Municipal Financial 30 170 Reports, • Contribute to the strategic planning process in a South African Municipality, • Conduct performance management to a South African municipal environment • Apply approaches to managing municipal income and expenditure within a multi-year framework, • Manage information technology resources in a municipal finance environment, • Participate in the design and implementation of municipal supply chain management, • Apply techniques and South African statutes to cash and investment management in a municipality environment, • Manage a municipality’s assets and liabilities. Contract Period: 12 Months. (EN) Aggiungi a preferiti
Cliente: ONLINE TENDERS

Numero: 118170052

Nazione: South Africa

Fonte: ONLINE TENDERS

05 nov
Tenders are hereby invited for the appointment of a contractor for the design, construction and commissioning of the prayer facilities and staff rest area at King Shaka International Airport. Scope of Work: Works deliverables include but not limited to: New Islamic faith prayer facilities: a. Islamic faith prayer facilities: approximate extent, 100 sqm under roof; b. Multidenominational prayer facilities: approximate extent 75 sqm under roof; c. Male and female sections wash areas; d. Sandals and shoe rack; e. Trolley parking area; f. Bulk HVAC, Fire detection and suppression system; g. Bulk Electrical supply; h. Bulk electronic supply ACSA electronic standards: i. Flight information display feed; ii. Wi-fi network access; i. Male, female and disabled ablutions; j. Exclude all internal furnishing; 2. New multidenominational faith prayer facilities: a. Multidenominational prayer facilities: approximate extent 75 sqm under roof; b. Trolley parking area; c. Bulk HVAC, Fire detection and suppression system; d. Bulk Electrical supply; e. Bulk electronic supply ACSA electronic standards: i. Flight information display feed and monitor; ii. Wi-fi network access; f. Male, female and disabled ablutions; g. Supply all basic furnishings as shall be prescribed; 3. Establish new staff rest area: approximately 200 sqm: a. Bulk HVAC, Fire detection and suppression system; b. Bulk Electrical supply; c. Bulk electronic supply ACSA electronic standards: i. Flight information display feed and monitor; ii. General purpose TV monitor; iii. Wi-fi network access; d. Male, female and disabled ablutions; e. Supply all basic furnishings as shall be prescribed; 4. Design the works and get them approved internally and externally; 5. Services investigations; 6. Cost the works and get the cost approved; 7. Submit safety plan file, comply with required training, obtain works and personnel permits; 8. Establish site camp and procure materials; 9. Submit construction program for approval and the estimated cash flow; 10. Commence construction and maintain program milestones, revised as per the provisions of contract; 11. Close out the works. Contractor shall make themselves familiar and comply with the closure requirements, especially on issuing CAD drawings and Data; 12. Commission and hand over in accordance with ACSA maintenance and engineering’s department. Key personnel required: 1. Mechanical Engineer; 2. Electrical Engineer; 3. Structural Engineer; 4. Civil Engineer; 5. Quantity Surveyor; 6. Construction Manager; 7. Construction Health and Safety Agent. (EN) Aggiungi a preferiti
Cliente: ONLINE TENDERS

Numero: 113475510

Nazione: South Africa

Fonte: ONLINE TENDERS